The city said all emergency flooding calls were currently being directed to Halifax Water at 90. on Sunday, more than 2,000 Nova Scotia Power customers were without electricity, down from about 70,000 during the most severe moments of the storm. “This state of emergency supersedes any municipal SOE and will allow for the Province to work with its partners in a coordinated provincewide response to and recovery from this event,” a statement read.Īs of 5 p.m. 5.Īccording to a release from the province, the emergency order will limit travel in impacted areas, allow deployment of additional assets to aid in the recovery response, and assemble a “coordinated restoration of impacted critical infrastructure”. In response to the severe flooding, a provincewide state of emergency was declared on Saturday and will remain in effect until Aug. The port city typically receives about 90 to 100 millimetres of rain during an average July.Įnvironment Canada says some parts of Nova Scotia may have received more than 300 mm of rain in 24 hours, based on radar estimates and unofficial observations. It dumped more than 200 millimetres of rain in the Halifax area. Friday and continued through the night, causing chaos for drivers and homeowners. Municipal offices will be closed on Monday to reduce traffic and allow crews to continue with repairs.Ī torrential downpour, accompanied by persistent thunder and lightning, started around 3:30 p.m. The city has published an online live tracker to share information on blocked roads in the municipality. “Extreme caution is also advised near the Sackville River and residents are advised to stay away from flood water in all areas,” the update continued. Officials are asking residents experiencing flooding on their properties to shelter in place unless there is an emergency. “Inspection staff are actively assessing areas and determining damage with over 400 public infrastructure service requests to-date for necessary repairs,” the release said. The update continued to say that repairs will be “extensive” with some expected to take several days or weeks. “Bridges will require a structural assessment before they can be opened, and water levels must be at normal level to complete those assessments.”
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |